Sonshine Park Construction     


Click on a picture to enlarge it.

previous  Index page 1 2  next

009 010 11
6/14/09 - A special swing is designed for handicapped children.
9/7/09 - Work has begun on the backstops for the two baseball fields.
9/13/09 - The ballpark has cyclone fencing installed in the backstop and dugout areas.

Generated by Galerie    Sunday, September 13, 2009